Data Migration Plan
Most migration failures come from data nobody checked and a cutover nobody rehearsed. This plan covers the phases, the checks, and the rollback gate.
Best reader
Teams moving data between systems during a rebuild, replatform, or modernization
Outcome
A rehearsed migration with source-to-target mapping, reconciliation reports, and a tested way back.
Use this sequence
Inventory source systems, owners, and what must move.
Profile the data to find gaps, duplicates, and bad formats.
Write the source-to-target mapping with every transformation rule.
Build the migration scripts and run rehearsals on a copy.
Reconcile counts, totals, and samples after each run.
Freeze changes, cut over, and verify with business users.
Keep the old system available until the rollback window closes.
Profile and map before you move anything
Bad data moved faithfully is still bad data. Profile first, decide what to clean, archive, or leave behind, and record each rule in a mapping that lives in version control.
Inventory
Profiling results
Mapping document
Cleanup decisions
Rehearse and reconcile
Run the whole migration more than once on a copy. After each run compare record counts, key totals, and sampled records at table, record, and field level, and fix the differences before the real run.
Rehearsals
Reconciliation reports
Error handling
Timing of the cutover steps
Cutover and a rollback you have tried
Decide the conditions that stop the cutover and the steps that restore the old system. A rollback plan that has never been run is a hope, not a plan.
Go or no-go gate
Freeze window
Rollback steps
Post-cutover checks
Start in 60 seconds
Turn this checklist into a scoped plan.
Answer a few questions and get an AI-assisted, architect-reviewed scope, cost range, and timeline for your software project.
Frequently asked questions
Big-bang or phased migration?
A big-bang cutover moves everything at once and needs a strong rollback. A phased approach lowers the risk at each stage but takes more coordination and means two systems run for a while.
Who should sign off on migrated data?
The business owners of that data, not only the engineers. They know which records and totals must be right, and they should confirm it before the old system is retired.